Horonda Platform

The largest multipurpose logistics platform with modern intermodal terminal and commercial premises with integrated infrastructure in the Transcarpathian region.

Horonda Platform

The largest multipurpose logistics platform with modern intermodal terminal and commercial premises with integrated infrastructure in the Transcarpathian region.

ABOUT the
project

Area

Horonda Platform will be located on an area of 493,000 m2

2 parts

Dry port (13.8 ha), Industrial Park (35.5 ha)

Capacity

First stage: 1.5 mln t/year, 130,000 TEU

Location

29 km from Hungarian and Slovak borders, 70 km from Romanian border​

Service Facilities

Customs bonded zone · Truck parking · Rail & truck weighbridges · Laboratory · Inspection dock · Maintenance area

Rail–Road Capability

Dual gauge tracks (1520/1435 mm), 4 tracks 1,000+ m each, connection to Kyiv–Chop highway (M-25)

Storage

Cross-dock 3,000 m² · Container yard 1,000+ TEU · Silo facilities · Vegetable oil tanks 3,000t · Bulk yard 25,000+ m²

Equipment

3 reachstakers, 2 lockotrattors, hopper and loading elevator

Routes

Italy · Germany · Austria · Croatia · Switzerland · Romania · Turkey · Hungary · Slovakia · Czech Republic

PORTS

Koper – 900 km
Trieste – 880km 
Venice – 1000 km

Rostock – 1200
Braque – 1500 
Rotterdam – 1700

DRY PORTS

Prague – 860
Vena – 580
Padua – 1000

UKRAINE

Ternopil – 350
Lviv – 270
Kyiv – 800

Planned services

Intermodal


– container handling and storage

– semitrailer transshipment

Cargo


– bulk and general cargo handling
– grain and vegetable oil
– container stuffing and stripping

Maintenance

 
 container maintenance and cleaning
– rolling stock maintenance

Support


– customs clearance
– laboratory services

– tailor-made logistics solutions
– driver amenities

HORONDA PLATFORM.
General plan
Edit Template
Map Legend

1. Production facilities with a railway 
2. Built to suit
3. Light Industrial Facility
4. Cogeneration units of 15 MW
5. Administrative buildings

6. Track village
7. Container storage area 
8. Cross-dock
9. Vegetable oil transloading zone
10. Grains and oilseeds transloading zone

A Strobichevo Electrostation
B Bridge overpass
C Kyiv-Chop highway
D Horonda Village
E Zhnyatyno (GTS Ukraine) 

European gauge
Ukrainian gauge
Power line
Gas line
Timeline

Due Diligence. Permitting, certification. Preparatory works completion.

Completion of the Horonda Port construction. Operational start.

Design completion. Financial Modeling and Feasibility Analysis. Start of Preparatory Works.

Start of the construction of the Horonda Platform

Launch of the 1st stage of Horonda Park Facilities.

Feasibility study. Start of design.

Launch of the 2nd stage of Horonda Park Facilities.

Feasibility study. Start of design.

Design completion. Financial Modeling and Feasibility Analysis. Start of Preparatory Works.

Due Diligence. Permitting, Approvals & Certification. Preparatory works completion.

Start of the construction of the Horonda Port.

Completion of the Horonda Port construction. Operational start.

Launch of the 1st stage of Horonda Park Facilities.

Launch of the 2nd stage of Horonda Park Facilities.

gallery